Continuous Improvement

The organization shall establish a continuous improvement process for backup and recovery management, driving ongoing enhancement of recovery capabilities. The process shall include mechanisms for identifying improvement opportunities, implementing changes, and measuring results, drawing inputs from recovery reviews, testing results, and best practice benchmarking.

Requirement ID
BCM-005-R010
Parent Control
Domain Code

Requirement Details & Guidance

BCM-005-R010 · BCM-005
Why This Requirement Exists

This requirement exists to improve recovery infrastructure and capabilities using reviews, testing, monitoring, and benchmarking and to ensure BCDR capabilities remain aligned with business needs, recovery objectives, and organizational risk.

Implementation Guidance

Establish and document the process for improve recovery infrastructure and capabilities using reviews, testing, monitoring, and benchmarking. Define accountable owners, required inputs and outputs, approval or validation points, criteria and thresholds, review frequency, exception handling, monitoring, reporting, and evidence requirements. Integrate the activity with risk management, incident response, technology operations, asset management, third-party management, and relevant business processes.

Practical Application & Audit Readiness

BCM-005-R010 · Field Guidance

Business Examples

    Common Audit Findings

      Common Mistakes

        Best Practices & Ownership

        BCM-005 · Recommended Approach

        Recommended Practices

          Typical Owner

          Cross-Mapped Regulatory Frameworks

          Harmonized Control Mappings
          FRAMEWORK CODE FRAMEWORK NAME & DETAILS FAMILY / CATEGORY VERSION ACTION
          ISO27001 ISO/IEC 27001 ISO/IEC 27001 specifies auditable requirements for... Clause: 10.1 – Continual improvement
          ISO
          Standard
          v2022 View →
          RBI-CSF RBI Cyber Security Framework / Master Directions RBI cyber-security requirements and directions set... Clause: 19) Incident Response & Management – 19.4 BCP/DR supporting cyber resilience, rapid recovery and secure resumption aligned to RTOs
          India
          Regulation
          vLatest View →
          SEBI-CSCRF SEBI Cyber Security & Cyber Resilience Framework SEBI’s Cybersecurity and Cyber Resilience Framewor... Clause: 6.1 RC.RP: Incident Recovery Plan Execution
          India
          Regulation
          vLatest View →
          DORA Digital Operational Resilience Act The EU Digital Operational Resilience Act establis... Clause: Article 12(2) – Backup systems and periodic testing of backup/restoration/recovery procedures Article 12(4) – Redundant ICT capacities
          EU
          Regulation
          vCurrent View →
          ISO27002 ISO/IEC 27002 ISO/IEC 27002 is a guidance standard containing a... Clause: 8.13 – Information backup
          ISO
          Standard
          v2022 View →
          NIS2 NIS2 Directive The NIS2 Directive establishes EU-wide cybersecuri... Clause: Article 21(2)(c) – Business continuity, including backup management, disaster recovery and crisis management
          EU
          Directive
          vCurrent View →
          PCI-DSS PCI DSS PCI DSS is an industry security standard maintaine... Clause: 12.10.1 – An incident response plan exists and is
          PCI
          Standard
          v4 View →
          ISO22301 ISO/IEC 22301 ISO 22301 specifies requirements for a Business Co... Clause: 8.1 – Operational planning and control; 8.4.4 – Business continuity plans
          ISO
          Standard
          v2019 View →
          NIST-CSF NIST Cybersecurity Framework (CSF) The NIST Cybersecurity Framework provides high-lev... Clause: PR.IR – Technology Infrastructure Resilience | PR.IR-03 – Mechanisms are implemented to achieve resilience requirements in normal and adverse situations RC.RP – Incident Recovery Plan Execution | RC.RP-01 – The recovery portion of the incident response plan is executed once initiated from the incident response process RC.RP – Incident Recovery Plan Execution | RC.RP-02 – Recovery actions are selected, scoped, prioritized, and performed
          NIST
          Framework
          v2 View →
          NIST80053 NIST SP 800-53 NIST SP 800-53 Rev. 5 presents control families, i... Clause: 3.6 – CONTINGENCY PLANNING, 3.4 – ASSESSMENT, AUTHORIZATION, AND MONITORING; CP-4 – CONTINGENCY PLAN TESTING, CA-7 – CONTINUOUS MONITORING
          NIST
          Control Catalog
          vRev. 5 View →
          NPCI-ISR NPCI Information Security Requirements NPCI information-security requirements define cont... Clause: Operational Review; Business Continuity Plan (BCP)
          India
          Standard
          vLatest View →
          SOC2 SOC 2 Trust Services Criteria SOC 2 is an independent examination and reporting... Clause: A1.2 – Availability – The entity authorizes, designs, develops or acquires, implements, operates, approves, maintains, and monitors environmental protections, software, data backup processes, and recovery infrastructure to meet its objectives. A1.3 – Availability – The entity tests recovery plan procedures supporting system recovery to meet its objectives. CC4.1 – Monitoring of Controls – COSO Principle 16: The entity selects, develops, and performs ongoing and/or separate evaluations to ascertain whether the components of internal control are present and functioning. CC4.2 – Monitoring of Controls – COSO Principle 17: The entity evaluates and communicates internal control deficiencies in a timely manner to those parties responsible for taking corrective action, including senior management and the board of directors, as appropriate.
          AICPA
          Audit Framework
          vLatest View →

          Parent Domain Context

          Governance Domain Baseline
          Domain Name:
          Business Continuity & Disaster Recovery (BCM)
          Purpose:
          To maintain business operations and recover technology systems in the event of a disruption.
          Scope:
          Enterprise

          Parent Control Context

          Control Baseline
          Control Name:
          Backup & Recovery Management (BCM-005)
          Summary:
          Establishes backup and recovery including backup strategy, scheduling, protection, retention, verification, recovery testing, data restoration, reporting, review, and continuous improvement.
          Business Description:
          Establish and maintain processes for backup, retention, protection, restoration, verification, and recovery of organizational data, systems, applications, and configurations.